Kitchen Renovation CAContractor CSLB #1158657Call (650) 562-6584
KRKITCHEN
RENOVATION CA

BAY AREA KITCHEN RENOVATIONS

Your kitchen.
Beautifully reimagined.

Thoughtful cabinetry. A better layout. Finishes that feel like you. Bring your entire kitchen together with a clear renovation plan.

THOUGHTFUL LAYOUTSCONSIDERED MATERIALSA CLEAR PLAN
Kitchen design inspiration featuring walnut cabinetry, a light stone island, and contemporary lighting
CABINETRY · STONE · EVERYDAY LIVING

FROM THE FIRST IDEA
TO THE FINAL DETAIL.

Cabinetry. Countertops. Lighting. Layout.
One considered vision for the whole kitchen.

Compare renovation scopes

PLAN YOUR INVESTMENT

A useful range.
Before a detailed estimate.

Preliminary Bay Area planning ranges. Your kitchen size, cabinetry, appliances, and utility or wall changes determine the final scope and price.

Cosmetic refresh

$25,000–$45,000

Focus on selected surfaces, finishes, hardware, and existing cabinetry where suitable.

Same-layout remodel

$50,000–$90,000

Replace cabinetry and surfaces while keeping the main footprint. Review utilities and permits.

Full remodel / layout changes

$90,000–$180,000+

Allow for layout changes, custom cabinetry, premium stone, and more involved utility or structural work.

Planning guidance, not a quote or fixed-price package. Appliances, permit and design fees, and the work included are itemized in your project-specific estimate after a site review.

01 / WHAT WE DO

Beyond cabinets.
The complete renovation.

Whether you want to refresh the essentials or rethink the entire room, start with a scope that fits your home.

02 / THE DESIGN COLLECTION

A kitchen with
your point of view.

Three design directions. Explore the cabinetry, stone, and details that feel right for your home.

YOUR STARTING POINT

A great starting point for open living spaces. Pair natural wood with a durable light countertop and a quiet backsplash.

Discuss this direction

KITCHEN INSPIRATION

Before & after.

Ten different kitchens. Compare cabinetry, surfaces, and finishes side by side.

01

Walnut modern

Walnut modern kitchen — before renovation illustration
Before
Walnut modern kitchen — after renovation illustration
After

Warm walnut cabinetry, light stone, and clean lines.

02

White Shaker

White Shaker kitchen — before renovation illustration
Before
White Shaker kitchen — after renovation illustration
After

Classic cabinet profiles with bright, balanced finishes.

03

Natural oak

Natural oak kitchen — before renovation illustration
Before
Natural oak kitchen — after renovation illustration
After

Light oak and a soft palette for an airy kitchen.

04

Navy & brass

Navy & brass kitchen — before renovation illustration
Before
Navy & brass kitchen — after renovation illustration
After

Rich cabinetry with warm metal details.

05

Soft sage

Soft sage kitchen — before renovation illustration
Before
Soft sage kitchen — after renovation illustration
After

A gentle green palette with familiar, welcoming forms.

06

Charcoal contemporary

Charcoal contemporary kitchen — before renovation illustration
Before
Charcoal contemporary kitchen — after renovation illustration
After

Dark cabinetry and streamlined surfaces.

07

Cream European

Cream European kitchen — before renovation illustration
Before
Cream European kitchen — after renovation illustration
After

Warm cream tones with refined traditional details.

08

Bright galley

Bright galley kitchen — before renovation illustration
Before
Bright galley kitchen — after renovation illustration
After

A lighter finish palette in a compact footprint.

09

Warm midcentury

Warm midcentury kitchen — before renovation illustration
Before
Warm midcentury kitchen — after renovation illustration
After

Wood tones and simple forms with lasting character.

10

Coastal light

Coastal light kitchen — before renovation illustration
Before
Coastal light kitchen — after renovation illustration
After

Pale finishes and natural textures for relaxed living.

Illustrative examples, not completed client projects.

Plan my kitchen

03 / A CLEAR PATH FORWARD

From first conversation
to finishing touches.

A good renovation starts before demolition. Align the scope, selections, and practical details first.

01

Share your vision

Tell us about your space, what you want to change, and the priorities that matter most.

02

Review the space

Understand the existing kitchen, site conditions, utility needs, and permit requirements.

03

Define the plan

Bring layout, materials, scope, pricing, and the proposed schedule together for review.

04

Build & finish

Move forward under a written agreement, then review the details at project handoff.

CABINETS, MATERIALS & SCHEDULING

Specify the cabinets.
Then set the start.

The cabinet schedule records the manufacturer, line, construction, finish, dimensions, accessories, and supplier-confirmed delivery date.

Stock cabinetry

Check available sizes, filler requirements, finish availability, and whether every piece is in stock before demolition.

Semi-custom cabinetry

Confirm size options, finished panels, storage inserts, shop-drawing approval, and the supplier’s current production slot.

Custom cabinetry

Approve measured drawings, finish samples, appliance integration, and fabrication details before release. Delivery depends on the selected shop.

Brand and cabinet-line selection is project-specific. Lead times are confirmed in writing with the supplier rather than promised as a universal delivery window.

  1. Before construction

    Measure → approve layout and selections → obtain required permits → confirm cabinet delivery.

  2. Early construction

    Protect the home, demolish the agreed scope, complete rough trades, and pass required rough inspections.

  3. Installation

    Install cabinetry, measure and fabricate countertops, then coordinate backsplash, appliances, and final trade work.

  4. Completion

    Complete final inspections, review the punch list, and hand over agreed documentation.

Planning windows after approvals and materials: 5–7 weeks for a same-layout remodel and 8–14 weeks for structural or utility changes. Actual milestones follow the agreed scope and inspection availability.

BEFORE YOU REQUEST A VISIT

The practical answers.

Scope, scheduling, and permits come before the final price.

Cost

Preliminary Bay Area ranges: $25,000–$45,000 for a cosmetic refresh; $50,000–$90,000 for a same-layout remodel; $90,000–$180,000+ for layout changes and premium custom work. Size, materials, utilities, and existing conditions change the estimate.

These are planning ranges, not quotes. Design, appliances, permits, and the included work are itemized after the site review.

Duration

Allow about 5–7 weeks of construction for a same-layout kitchen after materials arrive and permits are ready, or 8–14 weeks for a layout-changing remodel. Cabinet lead times, design, and permit processing come before that construction window.

Permits

Permit requirements follow the city and exact scope. Cabinet replacement can require a permit even if the layout stays. Electrical, plumbing, ventilation, and wall changes generally need local review before work begins.

Find your city’s permit guide

Can the layout stay?

Yes, subject to the existing conditions and appliance fit. A same-layout remodel can replace cabinetry and surfaces while keeping the main footprint. Wiring, plumbing, ventilation, and permits still need review. Wall removal and relocated utilities are separate scope decisions.

05 / BEFORE YOU BEGIN

A few good
questions.

A clearer picture before your first conversation.

Where do I start with a kitchen renovation?

Start with what is not working: storage, workflow, lighting, or the layout. Share your city, goals, and a rough budget in the consultation form. A site review can then help define a practical scope.

How much will my kitchen renovation cost?

Use these preliminary planning ranges: cosmetic refresh $25,000–$45,000; full remodel keeping the layout $50,000–$90,000; layout changes, custom cabinets, and premium stone $90,000–$180,000+. These are not quotes. Size, cabinetry, appliances, site conditions, and moving walls or plumbing change the number. We review the site and scope before providing a project-specific written estimate.

Can I keep my existing kitchen layout?

Yes. An update within the existing footprint can focus on cabinets, countertops, backsplash, lighting, and finishes. Existing utilities and the condition of the space still need review.

Will my project need permits?

Painting and some finish-only work may be exempt, depending on the city. A same-layout kitchen remodel can still require permits, including cabinet replacement in some cities. Plumbing, electrical, mechanical, and wall changes generally need permit review. We review the scope on site and confirm requirements with your local building department before work starts.

How long does a kitchen remodel take?

For planning, allow about 5–7 weeks of construction for a same-layout remodel after materials arrive and permits are ready, or 8–14 weeks for more involved layout and utility changes. Design, cabinet lead times, and permit processing come before that construction window and can add time. Hidden conditions and inspection scheduling can also affect the final schedule.

A WRITTEN SCOPE YOU CAN REVIEW

See what the plan
needs to define.

Illustrative scope outline. This is not a completed project, client proposal, quote, or construction agreement.

Same-layout kitchen remodelSample outline · specifications confirmed after the visit
Existing footprint
Retain the agreed sink, range, and refrigerator positions; identify any utility upgrades separately.
Cabinetry and surfaces
Attach the approved cabinet layout, finish schedule, hardware list, countertop material, edge profile, seam plan, and backsplash extent.
Trade work and permits
Itemize electrical, plumbing, and ventilation work; assign permit applications, fees, and inspection coordination.
Price and allowances
Separate material and labor items, owner-supplied appliances, selection allowances, exclusions, and concealed-condition procedures.
Schedule and handoff
State ordering milestones, the proposed construction sequence, inspection dependencies, protection and cleanup, and the final punch-list review.

06 / LET’S START WITH YOUR SPACE

Your next chapter
starts in the kitchen.

Share your goals, city, and timing. We’ll start with a phone conversation, then arrange a site review before project-specific pricing.

Who comes to the visit?

A project representative. The assigned contact’s name and role are confirmed when the visit is scheduled.

What happens on site?

Review measurements, appliance positions, utility and wall changes, access, and your city’s permit path. The next step is an itemized scope with selections, allowances, exclusions, and a proposed schedule.

See the sample scope outline

Share your goals and project city

Choose a starting scope and budget

Tell us your preferred timing

San Jose office84 W Santa Clara St, Suite 700San Jose, CA 95113
Walnut Creek office1990 N California Blvd, 8th FloorWalnut Creek, CA 94596
Cupertino office10080 N Wolfe Road, Suite SW3-200Cupertino, CA 95014(650) 562-6584

Cupertino office phone
(650) 562-6584

Corporate email
info@kitchenrenovationca.com

Submitting a request does not create a construction agreement or commit you to a project.

Let’s talk about your kitchen.

Fields marked * are required.

Inspiration preference

Warm modern

Change direction

What happens next
We’ll reply within one business day, discuss your goals by phone, and arrange a site visit before providing project-specific pricing.

We collect your contact and project details to respond, plan a site review, and manage your inquiry. See the notice at collection for use, disclosures, retention, and California rights.