Operated by California Build & Realty Inc.R&B Master Construction Inc. · CSLB #1158657Call (650) 562-6295
KRKITCHEN
RENOVATION CA

BAY AREA · COMPLETE KITCHEN REMODELING

Your kitchen. Reimagined as a whole.

Plan cabinetry, surfaces, lighting, and circulation together, with one defined scope from site review to handoff.

THOUGHTFUL LAYOUTSCONSIDERED MATERIALSA CLEAR PLAN
Complete kitchen remodeling kitchen design inspiration
CABINETRY · STONE · EVERYDAY LIVING

THE SCOPE

A complete plan

Bring the room together before demolition. We review what can stay, what should change, and how materials and utility work fit the proposed budget.

Existing layout and daily routines

Cabinetry, storage, and appliance fit

Countertops, backsplash, and flooring

Utility changes and permit coordination

Discuss your complete kitchen remodeling project

PLANNING THE WORK

What comes before
installation.

For planning, a same-layout remodel typically allows 4–6 weeks of construction after materials arrive and permits are ready. A layout-changing remodel may require 8–14 weeks. Design, permits, and cabinet lead times come before that window.

Bring to the site review

  • A measured existing plan and the proposed layout
  • Appliance specifications and a cabinet schedule
  • Selections, allowances, and an inspection sequence

What changes the estimate

Cabinet construction, the number of appliances, stone fabrication, floor area, utility relocation, and structural scope.

Materials, labor, allowances, and related trade work are listed separately in the written scope. Whole-kitchen price ranges are not individual-service quotes.

Before construction

Measure the kitchen, resolve the layout, confirm the permit path, and order long-lead materials.

Rough work

Protect adjacent rooms, remove the agreed items, complete required utility work, and reach the inspection milestones.

Finish work

Install cabinets, template and fit surfaces, complete finishes, reconnect appliances, and review the punch list.

CABINETS, MATERIALS & SCHEDULING

Specify the cabinets.
Then set the start.

The cabinet schedule records the manufacturer, line, construction, finish, dimensions, accessories, and supplier-confirmed delivery date.

Stock cabinetry

Check available sizes, filler requirements, finish availability, and whether every piece is in stock before demolition.

Semi-custom cabinetry

Confirm size options, finished panels, storage inserts, shop-drawing approval, and the supplier’s current production slot.

Custom cabinetry

Approve measured drawings, finish samples, appliance integration, and fabrication details before release. Delivery depends on the selected shop.

Brand and cabinet-line selection is project-specific. Lead times are confirmed in writing with the supplier rather than promised as a universal delivery window.

  1. Before construction

    Measure → approve layout and selections → obtain required permits → confirm cabinet delivery.

  2. Early construction

    Protect the home, demolish the agreed scope, complete rough trades, and pass required rough inspections.

  3. Installation

    Install cabinetry, measure and fabricate countertops, then coordinate backsplash, appliances, and final trade work.

  4. Completion

    Complete final inspections, review the punch list, and hand over agreed documentation.

Planning windows after approvals and materials: 5–7 weeks for a same-layout remodel and 8–14 weeks for structural or utility changes. Actual milestones follow the agreed scope and inspection availability.

BEFORE YOU REQUEST A VISIT

Plan this part of your kitchen.

Scope, scheduling, and permits come before the final price.

Cost

Cabinet construction, the number of appliances, stone fabrication, floor area, utility relocation, and structural scope.

An individual-service estimate follows measurements and a defined scope. The full kitchen ranges do not price this work on its own.

Duration

For planning, a same-layout remodel typically allows 4–6 weeks of construction after materials arrive and permits are ready. A layout-changing remodel may require 8–14 weeks. Design, permits, and cabinet lead times come before that window.

Permits

Permit requirements follow the city and exact scope. Cabinet replacement can require a permit even if the layout stays. Electrical, plumbing, ventilation, and wall changes generally need local review before work begins.

Find your city’s permit guide

Can the layout stay?

Yes, subject to the existing conditions and appliance fit. A same-layout remodel can replace cabinetry and surfaces while keeping the main footprint. Wiring, plumbing, ventilation, and permits still need review. Wall removal and relocated utilities are separate scope decisions.

05 / BEFORE YOU BEGIN

A few good
questions.

Before planning your complete kitchen remodeling project.

Can I keep the existing footprint?

Yes. A complete renovation can retain the footprint while replacing cabinetry and finishes. Existing utilities, condition, and local permit requirements still need review.

How is this work priced?

Pricing follows a site review and a written scope. Material selections, measurements, installation conditions, and related utility work determine the estimate; a whole-kitchen planning range is not a quote for this individual service.

Where do you offer this service?

Share your project city to confirm availability. The kitchen service area includes San Jose, Santa Clara, Sunnyvale, Cupertino, Mountain View, Palo Alto, Fremont, Milpitas, Walnut Creek, Concord, San Ramon, and Danville.

A WRITTEN SCOPE YOU CAN REVIEW

See what the plan
needs to define.

Illustrative scope outline. This is not a completed project, client proposal, quote, or construction agreement.

Complete kitchen remodelingSample outline · specifications confirmed after the visit
Demolition
Identify the cabinets, counters, backsplash, and flooring to remove; list what stays.
Cabinetry
Attach the approved layout, finish schedule, hardware selection, and appliance openings.
Surfaces and utilities
List stone, seams, backsplash extent, fixture connections, trade work, and inspections.
Exclusions
Identify appliance purchases, design fees, permit charges, structural work, and concealed conditions separately.

RESEARCH THE CONSTRUCTION CONTRACTOR

Read the reviews
at the source.

These profiles belong to R&B Master Construction Inc., the construction contractor identified on this website. They are not reviews of a separate Kitchen Renovation CA entity.

06 / LET’S START WITH YOUR SPACE

Your next chapter
starts in the kitchen.

Share your goals, city, and timing. We’ll start with a phone conversation, then arrange a site review before project-specific pricing.

Who comes to the visit?

A construction representative from R&B Master Construction Inc. The assigned contact’s name and role are confirmed when the visit is scheduled.

What happens on site?

Review measurements, appliance positions, utility and wall changes, access, and your city’s permit path. The next step is an itemized scope with selections, allowances, exclusions, and a proposed schedule.

See the sample scope outline

Share your goals and project city

Choose a starting scope and budget

Tell us your preferred timing

Kitchen Renovation CA is operated by California Build & Realty Inc. Construction contractor: R&B Master Construction Inc., CSLB #1158657.

Call us
(650) 562-6295

Corporate email
projects@kitchenrenovationca.com

Submitting a request does not create a construction agreement or commit you to a project.

Plan your complete kitchen remodeling project.

Fields marked * are required.

Inspiration preference

Warm modern

Change direction

What happens next
We’ll reply within one business day, discuss your goals by phone, and arrange a site visit before providing project-specific pricing.

We collect your contact and project details to respond, plan a site review, and manage your inquiry. See the notice at collection for use, disclosures, retention, and California rights.