01 / PREPARE
What to prepare
- For the instant path: eligible single-family, ADU, or duplex work within the existing footprint, without wall, window, door, structural, or service-panel changes.
- Provide equipment specifications, project valuation, and electrical circuit information; include a load calculation when required.
- Before final inspection, supply applicable energy reports, fixture compliance, smoke/CO documentation, and debris-diversion records.