- Existing footprint
- Retain the agreed sink, range, and refrigerator positions; identify any utility upgrades separately.
- Cabinetry and surfaces
- Attach the approved cabinet layout, finish schedule, hardware list, countertop material, edge profile, seam plan, and backsplash extent.
- Trade work and permits
- Itemize electrical, plumbing, and ventilation work; assign permit applications, fees, and inspection coordination.
- Price and allowances
- Separate material and labor items, owner-supplied appliances, selection allowances, exclusions, and concealed-condition procedures.
- Schedule and handoff
- State ordering milestones, the proposed construction sequence, inspection dependencies, protection and cleanup, and the final punch-list review.